Lorem ipsum dolor sit amet, adipisc ing elit, consectetur adipiscing elit. Duis ut ligula leo adipiscing elit.

PHONE:           0035 244 58 265

E-MAIL:           info@example.com

ADDRESS:      Rohr PL 989, NY

Views Navigation

Event Views Navigation

Today

Airport Connector Construction: Late Summer-Winter

Along the Airport connector, construction begins in early August to replace the Clinton Enlow Bridge, which is near MM 1. The work will run through late November/early December. This portion of the Montour Trail will remain OPEN at all times throughout construction for pedestrian traffic only. The bridge will be closed for motor vehicles throughout construction.

Muse Branch Ribbon Cutting

The greater community Pittsburgh is invited to attend the official opening of the Muse branch on Thursday, August 21. It takes place at 10 AM at the Muse trailhead, near the McConnell Trails residential development on McConnell Road in Cecil Township. The ribbon cutting ceremony marks the culmination of more than ten years of planning, negotiation, and construction.     The Muse branch follows along the former right-of-way of a 1.6-mile spur constructed by the Montour Railroad to service a […]