Airport Connector Construction: Bridge Partially Open
Along the Airport connector beyond mainline MM 7.8, work began in early August to replace the Clinton Enlow Bridge, which is near MM A-0.9. The bridge was closed to all traffic in October, but has now re-opened on a reduced 4-feet width basis. Bike riders must dismount at either end of the construction site's narrow path until the entire bridge opens.