Lorem ipsum dolor sit amet, adipisc ing elit, consectetur adipiscing elit. Duis ut ligula leo adipiscing elit.

PHONE:           0035 244 58 265

E-MAIL:           info@example.com

ADDRESS:      Rohr PL 989, NY

Loading Events

« All Events

Airport Connector Construction

August 1 - December 1

Along the Airport connector, construction begins in early August to replace the Clinton Enlow Bridge, which is near MM 1. The work will run through late November/early December. This portion of the Montour Trail will remain OPEN at all times throughout construction for pedestrian traffic only. The bridge will be closed for motor vehicles throughout construction.

Details

Start:
August 1
End:
December 1
Event Category: