Lorem ipsum dolor sit amet, adipisc ing elit, consectetur adipiscing elit. Duis ut ligula leo adipiscing elit.

PHONE:           0035 244 58 265

E-MAIL:           info@example.com

ADDRESS:      Rohr PL 989, NY

Views Navigation

Event Views Navigation

Today
All Day

Airport Connector Construction: Late Summer-Winter

Along the Airport connector, construction begins in early August to replace the Clinton Enlow Bridge, which is near MM 1. The work will run through late November/early December. This portion of the Montour Trail will remain OPEN at all times throughout construction for pedestrian traffic only. The bridge will be closed for motor vehicles throughout construction.