Lorem ipsum dolor sit amet, adipisc ing elit, consectetur adipiscing elit. Duis ut ligula leo adipiscing elit.

PHONE:           0035 244 58 265

E-MAIL:           info@example.com

ADDRESS:      Rohr PL 989, NY

Alert

  1. Events
  2. Alert

Views Navigation

Event Views Navigation

Today

Airport Connector Construction

Along the Airport connector, construction begins in early August to replace the Clinton Enlow Bridge, which is near MM 1. The work will run through late November/early December. This portion of the Montour Trail will remain OPEN at all times throughout construction for pedestrian traffic only. The bridge will be closed for motor vehicles throughout construction.

Long-term Construction in Airport Area: Summer-Fall 2025, Spring 2026

Duquesne Light is replacing transmission lines and towers near Hassam Road (MM 1.4), so there may be temporary closures in that area, especially in late summer-early fall 2025 and again in spring 2026. Be cautious from MM .8 to 1.4; follow all wa+rnings on signage as well as verbal instructions from construction flaggers.