Lorem ipsum dolor sit amet, adipisc ing elit, consectetur adipiscing elit. Duis ut ligula leo adipiscing elit.

PHONE:           0035 244 58 265

E-MAIL:           info@example.com

ADDRESS:      Rohr PL 989, NY

Views Navigation

Event Views Navigation

Today
  • Airport Connector Construction: Bridge Closed

    Along the Airport connector beyond the mainline MM 7.8, work began in early August to replace the Clinton Enlow Bridge, which is near MM A-0.9. The bridge itself will be closed to all traffic beginning October 13, for a month. There is not a viable on-road detour. The trail and the new bridge is tentatively scheduled to reopen on November 14.

  • National Tunnel Closure

    During a recent inspection of the National Tunnel, Montour Trail engineers found areas of deterioration of the concrete ceiling, enough to affect the tunnel's stability. Therefore, Montour Trail Council has decided that, in the interest of safety, the National Tunnel will temporarily close on Tuesday morning 11 November, for initial stabilization work to its deteriorating ceiling near the western entrance.  The Tunnel, located in Cecil township at MM 25, was constructed by the Montour Railroad in the early twentieth century. […]